Months 1–3
Foundations
We excavate, bore piles down to hard strata and pour the raft in one continuous pour, so the building starts on rock rather than hope.
- 20 bored piles
- 900 mm raft
- Basement retaining walls
Live site · Grid C-4
Meridian Business TowerGeneral contractors · Est. 2008
Commercial, industrial and residential construction across Maharashtra. Fixed prices, honest programmes and sites that finish on the date we agreed.
Services
We organise our work the way specifications do, by division. Hire us for one package or the whole building.
One accountable team from mobilisation to handover: site setup, subcontractor coordination, quality checks and a weekly programme you can read.
Foundations, raft slabs, post-tensioned floors and shear cores, poured with our own formwork crews and tested at every pour.
Pre-engineered warehouses, mezzanines and long-span roofs, fabricated off site and erected by certified rigging teams.
Offices, clinics and retail floors delivered turnkey: partitions, ceilings, flooring, joinery and MEP coordination.
Structural strengthening, façade replacement and phased refurbishment of occupied buildings with minimal disruption.
Architecture, structure and services designed in-house against a fixed budget, so the drawings and the price arrive together.
How we build
Scroll to assemble a typical eight-storey office building, stage by stage, the way our crews actually build it.
Months 1–3
We excavate, bore piles down to hard strata and pour the raft in one continuous pour, so the building starts on rock rather than hope.
Months 3–7
Columns, slabs and the lift core rise on a seven-day floor cycle. Every pour is cube-tested before the next level goes up.
Months 6–9
Fire sprinklers, water, drainage, ducts and cable trays go in floor by floor and are pressure-tested before any ceiling closes over them.
Months 7–10
Unitised glass façade panels are craned in and sealed from the ground up. Once the last panel is in, the building is weathertight and finishes can start.
Months 11–12
The crane comes down, the plaza and planting go in, systems are commissioned and you get the keys with as-built drawings and 12 months of defects cover.
Selected projects
Offices, warehouses, homes and schools. Each model below is drawn from the real massing of the building.
A 16-storey office tower with a two-level retail podium and basement parking.
Pre-engineered steel warehouse with a 30 m clear span and sawtooth roof lights.
Three residential blocks of 5 to 9 storeys around a landscaped courtyard.
A 120-bed hospital wing with operating theatres, built beside a working hospital.
Safety & quality
Lost-time injury frequency rate per 200,000 hours worked, last 3 years
Site hours logged with daily toolbox talks and permit-to-work
Defects liability cover on every handover, in writing